Also mentioned
ML-KEMML-KEMModule-Lattice-based Key Encapsulation MechanismModule-Lattice-Based Key-Encapsulation Mechanism, the NIST-standardized post-quantum KEM derived from CRYSTALS-Kyber and specified in FIPS 203.Read the full entry (new tab), TLSTLSTransport Layer SecurityTransport Layer Security, the protocol that encrypts and authenticates most internet traffic, including HTTPS. It uses key exchange, certificates, and symmetric encryption to protect a session.Read the full entry (new tab), NISTNISTNational Institute of Standards and TechnologyThe U.S. National Institute of Standards and Technology, the agency that develops and publishes cryptographic standards, including the FIPS series and post-quantum algorithms.Read the full entry (new tab), PQCPQCpost-quantum cryptographyCryptographic algorithms designed to run on today's classical computers while remaining secure against attacks by both classical and future quantum computers.Read the full entry (new tab), CBOMCBOMcryptographic bill of materialsA Cryptographic Bill of Materials, a structured, machine-readable inventory of the cryptographic assets used by a system or application, often expressed as an extension of a software bill of materials (SBOM).Read the full entry (new tab) are defined in the glossary.
Read this first
A vendor's post-quantum roadmap is useful only when it names the affected products, versions, cryptographic dependencies, release gates and retirement conditions. Ask for artifacts that can be checked: a scoped inventory, supported algorithm profiles, test evidence, upgrade paths, rollback controls and dated commitments. A slide that says "PQC-ready by 2030" is not evidence that your deployment can migrate before then.
A roadmap is a claim until it identifies the product boundary
The joint ASD, CISA and NSA vendor guidance organizes supplier review around five activities: locate, assess, triage, implement, and communicate and educate. That sequence starts before algorithm selection. A vendor must first identify which parts of its product perform key exchange, authentication, signing, encryption and key storage, including functions inherited from operating systems, cloud services, firmware and third-party libraries.
Define the boundary you are buying before scoring the answer. A SaaS provider may control application TLS but not the customer identity provider. A network appliance vendor may ship updateable software around a hardware root of trust that cannot accept a new signature format. A managed service may rely on a cloud KMS whose roadmap belongs to another supplier. Put each dependency into the same cryptographic inventory used for internal systems, and connect supplier claims to the relevant CBOM record.
| Vendor statement | Evidence to request | Decision it supports |
|---|---|---|
| We support PQC | Product, version, protocol, algorithm profile, default state and release status | Whether the feature exists in the product you operate |
| We use ML-KEM | Parameter set, protocol binding, library and version, key lifecycle and interoperability result | Whether the implementation matches your architecture and policy |
| No hardware change is needed | Trust-anchor format, firmware verifier limits, memory budget and supported upgrade path | Whether deployed devices can accept the new keys and signatures |
| We will be ready by 2030 | Generally available release date, customer test window, deprecation sequence and support commitment | Whether your rollout can finish before the applicable deadline |
| Rollback is supported | Documented recovery flow, downgrade floor, audit event and negative test result | Whether recovery preserves the intended security boundary |
Ask for the inventory at deployment granularity
An algorithm name is too coarse for migration planning. The inventory should identify the protocol and purpose, implementation library, version, configuration, certificate or key format, hardware boundary, owner, data flow and update mechanism. The NIST migration project describes the same practical scope: algorithms, protocols, keys, certificates, libraries, parameters, hardware roots of trust, vendor boundaries and the data those controls protect.
- Separate key establishment from authentication. Hybrid TLS key exchange does not make a classical certificate post-quantum.
- List firmware, boot ROM, HSM, TPM and secure-element constraints separately from updateable application code.
- Record third-party libraries and cloud services that choose algorithms on the vendor's behalf.
- Name the exact product edition and licensing tier. A feature outside the purchased tier is not part of the migration path.
- Capture where a customer can configure the profile and where the vendor fixes it.
- Include end-of-support dates for versions that cannot migrate.
Compare that evidence with your PQC readiness assessment. The supplier's boundary and your system boundary rarely match. Your assessment must cover the connectors between them, including identity, certificate issuance, logging, backup, monitoring and recovery.
Convert roadmap dates into acceptance gates
The joint guidance uses the end of 2030 as a planning milestone for vendor-readiness discussions, while explicitly telling readers to follow the rules for their own jurisdiction, sector and risk environment. Treat that date as a prompt to work backwards, not a universal compliance claim. A usable roadmap reserves time for customer testing, staged rollout, exception handling and removal of the classical path.
| Gate | Required evidence | Exit condition |
|---|---|---|
| Discovery | Scoped inventory and responsibility map | Every cryptographic dependency has an owner and update path |
| Preview | Released test build, configuration guide and known limitations | Customer can reproduce the advertised negotiation or signature |
| Acceptance | Positive, negative, interoperability and rollback results | The production profile passes agreed tests without silent fallback |
| General availability | Supported release, licensing terms and operational documentation | PQC can be enabled through a supported production path |
| Classical retirement | Telemetry, exception register and enforced cryptographic floor | The old algorithm can no longer be selected outside approved recovery |
Put these gates beside the internal PQC migration roadmap. If a critical vendor's general-availability date falls after your acceptance window, the plan needs an alternative product, an architectural isolation measure or a documented risk decision. Moving the date in a dashboard does not resolve the dependency.
Test enablement, failure and recovery paths
A demonstration with one successful handshake proves only that one path worked. Ask for a supported build and reproduce the feature in an environment you control. Preserve the negotiated algorithm, certificate chain or signature profile, library version, configuration and logs. Then change one condition at a time: unsupported peer, altered algorithm identifier, malformed key, expired certificate, disabled feature flag, interrupted rotation and attempted downgrade.
- Confirm that the advertised post-quantum profile is actually negotiated, not merely present in a supported-algorithms list.
- Verify that a failed post-quantum attempt does not silently select a classical path outside the documented policy.
- Exercise key and certificate rotation before the first production cutover.
- Test recovery without lowering the cryptographic floor or losing audit evidence.
- Measure message, certificate, memory and latency changes on the smallest supported system.
- Repeat the acceptance suite after library, firmware and dependency updates.
Use the certificate and key-format tests when the product moves PQC material across files, APIs or certificate chains. For algorithm implementations, conformance testing can check the primitive against the applicable standard. Neither replaces a product-level test of negotiation, authorization, failure handling and recovery.
Hybrid is a transition state, not a complete roadmap
A classical and post-quantum hybrid can reduce migration risk while peers and infrastructure change, but it still needs a named combiner, protocol profile, fallback rule and retirement condition. Ask when the classical component becomes removable and what evidence will authorize that change. "We support hybrid" without those details leaves the final transition undefined.
Put cryptographic agility into the contract
NIST defines crypto agility as the ability to replace and adapt algorithms across protocols, applications, software, hardware, firmware and infrastructure while preserving security and operations. Translate that capability into support obligations. The contract should not prescribe a speculative algorithm years in advance, but it can require transparent inventories, standards-based profiles, test access, supported updates and notice before cryptographic deprecation.
| Term | Minimum commitment | Evidence |
|---|---|---|
| Cryptographic disclosure | Current algorithms, protocols, libraries, versions and hardware constraints | Versioned inventory or CBOM extract |
| Change notification | Advance notice for algorithm, certificate, key-format and trust-anchor changes | Security advisory or release notice tied to product versions |
| Update path | Supported delivery of cryptographic changes without unplanned product replacement | Patch, firmware or documented replacement roadmap |
| Acceptance access | Customer can test preview and supported releases before enforcement | Test build, configuration guide and interoperability environment |
| Deprecation | Classical algorithms have a published disablement and end-of-support sequence | Dates, telemetry criteria and approved exception process |
| Failure handling | No undocumented fallback after PQC negotiation or verification failure | Negative tests and auditable policy events |
The cryptographic-floor method is useful here. A product can remain operational during rollback without reopening every older algorithm. Ask the vendor to state the lowest acceptable profile for normal operation, emergency recovery and legacy interoperability, then test each boundary.
Score answers by reproducibility
A simple four-level scale keeps procurement language from outranking technical evidence. Score each critical claim separately: zero for no answer, one for an unversioned narrative, two for a versioned artifact, and three for a result your team can reproduce. Do not average away a zero on a dependency that protects long-lived sensitive data or controls a hardware replacement.
| Level | Evidence | Example |
|---|---|---|
| 0 | No answer or ownership | PQC is on the roadmap |
| 1 | Narrative with a date | Support is planned for 2030 |
| 2 | Versioned artifact | Release plan names the product, protocol and supported profile |
| 3 | Reproducible result | Customer test negotiates the profile and rejects the agreed downgrade cases |
An implementation audit can sample the highest-risk claims against code, configuration and test artifacts. The purpose is not to demand disclosure of private keys or proprietary source from every supplier. It is to distinguish a roadmap that can govern a migration from one that only communicates intent.
What this method does not prove
This method does not certify a vendor, guarantee a 2030 migration, or prove that an undisclosed implementation flaw is absent. It also does not turn a government planning milestone into a universal deadline. It gives procurement, security and engineering teams a shared way to ask for evidence, expose dependencies and decide whether a supplier's path fits their own risk and transition plan.
The useful outcome is a set of claims that can be rechecked after every relevant release. Product versions change, libraries are replaced, hardware reaches end of support and protocol drafts stabilize. A roadmap stays credible when its artifacts and acceptance results change with them.
References
Where this goes next